Skip to content

Retribution Calculator

Building Retribution Fee Simulation

Calculate an estimated building retribution fee in accordance with applicable regulations.

Building index

1Building Function
Index0Value (A)0
2Building Type
Index1Value (A)1
1ComplexityWeight0.3
Index0Value (B)0
2PermanencyWeight0.2
Index0Value (B)0
3HeightWeight0.5
Index1Index0Value (B)0.5
4OwnershipWeight1
Index1Value (B)1
Integration Index0

Building retribution

Locality Index
0.5%
SHST
IDR 6,170,000
Amount
IDR 0

Building infrastructure retribution

The retribution is calculated at 1.75% of the implementation cost according to the budget plan or contract.

Construction of Land Ownership Boundaries/Retainers/Securities

1. FenceIDR 4,500

IDR 0

2. Retaining WallIDR 42,000

IDR 0

3. Retaining Wall/Plot BoundaryIDR 42,000

IDR 0

Construction of Entrance Markers

4. GateIDR 371,000

IDR 0

5. GateIDR 90,000

IDR 0

Pavement Construction

6. RoadIDR 1,600

IDR 0

7. Ceremony GroundIDR 16,000

IDR 0

8. Open Sports FieldIDR 24,000

IDR 0

9. Unpaved Open Field for Commercial UseIDR 2,000

IDR 0

Asphalt and Concrete Pavement Construction

10. Asphalt PavementIDR 14,000

IDR 0

11. Concrete PavementIDR 24,000

IDR 0

Grass Block Pavement Construction

12. –IDR 1,900

IDR 0

Connecting Construction

13. Residential BridgeIDR 142,000

IDR 0

14. Commercial BridgeIDR 585,000

IDR 0

15. Box CulvertIDR 22,000

IDR 0

Connecting Construction (Inter-Building Bridge)

16. –IDR 142,000

IDR 0

Connecting Construction (Pedestrian Overpass)

17. –IDR 585,000

IDR 0

Connecting Construction (Pedestrian Underpass)

18. –IDR 585,000

IDR 0

Underground Pool/Reservoir Construction

19. Swimming PoolIDR 10,000

IDR 0

20. Underground Water Treatment ReservoirIDR 63,000

IDR 0

Septic Tank and Infiltration Well Construction

21. –IDR 22,000

IDR 0

Tower Construction

22. Reservoir TowerIDR 0

IDR 0

23. ChimneyIDR 0

IDR 0

Water Tower Construction

24. –IDR 0

IDR 0

Monument Construction

25. Monument Inside the Land ParcelIDR 378,000

IDR 0

26. Monument Outside the Land ParcelIDR 378,000

IDR 0

27. Statue Inside the Land ParcelIDR 70,000

IDR 0

28. Statue Outside the Land ParcelIDR 70,000

IDR 0

Electric Installation/Substation Construction

29. Electrical InstallationIDR 280,000

IDR 0

30. Excess AreaIDR 28,000

IDR 0

31. Telephone/Communication InstallationIDR 168,000

IDR 0

32. Excess AreaIDR 16,800

IDR 0

33. Processing InstallationIDR 224,000

IDR 0

34. Excess AreaIDR 22,400

IDR 0

Advertisement/Signboard Construction

35. Billboard Advertising Panel Area > 10 m2IDR 973,000

IDR 0

36. Billboard Advertising Panel Area < 10 m2IDR 789,000

IDR 0

37. Billboard Advertising Panel Excess Area > 10 m2IDR 168,000

IDR 0

38. Name Board (Freestanding or Wall Fence) Advertising Panel Area > 10 m2IDR 724,000

IDR 0

39. Name Board (Freestanding or Wall Fence) Advertising Panel Area < 10 m2IDR 592,000

IDR 0

40. Name Board (Freestanding or Wall Fence) Excess Area > 10 m2IDR 22,400

IDR 0

Machine Foundation (Outside the Building)

41. –IDR 100,000

IDR 0

Television Tower Construction

42. –IDR 0

IDR 0

Radio Antenna Construction

43. Standing Tower with 3-4 Foot Structure Height 25-50 mIDR 0

IDR 0

44. Standing Tower with 3-4 Foot Structure Height 51-75 mIDR 0

IDR 0

45. Standing Tower with 3-4 Foot Structure Height 76-100 mIDR 0

IDR 0

46. Standing Tower with 3-4 Foot Structure Height 100-125 mIDR 0

IDR 0

47. Standing Tower with 3-4 Foot Structure Height 126-150 mIDR 0

IDR 0

48. Standing Tower with 3-4 Foot Structure Height Above 150 mIDR 0

IDR 0

49. Guy Wire System/Span Wire Height 0-50 mIDR 0

IDR 0

50. Guy Wire System/Span Wire Height 50-75 mIDR 0

IDR 0

51. Guy Wire System/Span Wire Height 76-100 mIDR 0

IDR 0

52. Guy Wire System/Span Wire Height Above 100 mIDR 0

IDR 0

Antenna Construction (Telecommunication Tower)

53. Shared Tower Height Less Than 25 mIDR 0

IDR 0

54. Shared Tower Height 25-50 mIDR 0

IDR 0

55. Shared Tower Height Above 50 mIDR 0

IDR 0

56. Independent Tower Height Less Than 25 mIDR 0

IDR 0

57. Independent Tower Height 25-50 mIDR 0

IDR 0

58. Independent Tower Height Above 50 mIDR 0

IDR 0

Underground Fuel Tank

59. –IDR 0

IDR 0

Drainage Work (Within Plot)

60. ChannelIDR 1,000

IDR 0

61. ReservoirIDR 50,000

IDR 0

Storage/Silo Construction

62. –IDR 138,000

IDR 0
Total Building Infrastructure RetributionIDR 0
Estimated totalIDR 0