Building Approval and Certificate of Proper Function Information

The legal basis, service flow and requirements for PBG and SLF applications, and the building inspection flow.

Building Approval (PBG)

Building Approval, abbreviated as PBG, is a permit granted to building owners to construct new buildings, modify, expand, reduce, and/or maintain buildings in accordance with building technical standards.

Technical planning documents are submitted to the Regency/City Government to obtain PBG before construction implementation.

Building Approval (PBG) Flow
  1. 1

    Open and register on the simbg.pu.go.id(opens in a new tab) website

  2. 2

    The completeness of the files is checked by the Technical Service verifier

  3. 3

    Technical Consultation Meeting by TPA/TPT

  4. 4

    Letter of compliance with technical standards by the head of the technical service, and determination of levies

  5. 5

    SKRD Delivery, Retribution Payment and PBG Issuance

General Document Requirements for Building Approval (PBG)

Land Data

5
  • Land Certificate
  • Land Use Permit
  • Land and Building Tax Payment Proof
  • Land Boundary Map
  • Soil Test Results

General Data

5
  • Identity Card/Residence Permit Information
  • Spatial Information (ITR/KRK/KKPR)
  • Land Use Permit
  • Environmental Documents
  • Service Provider Data and Work Contract

Architecture Data

2
  • Architectural Drawings
  • Architectural Technical Specifications

Structural Data

3
  • Structural Analysis
  • Structural Drawings
  • Structural Technical Specifications

MEP Data

9
  • MEP Analysis and Calculations
  • Electrical System Drawings
  • Lightning Protection System Drawings
  • Data and Communication System Drawings
  • Security System Drawings
  • Plumbing Sanitation System Drawings
  • Fire Protection System Drawings
  • HVAC System Drawings
  • MEP Technical Specifications

Certificate of Proper Function (SLF)

The Building Certificate of Proper Function, abbreviated as SLF, is a certificate issued by the Regional Government to declare the feasibility of building functionality before it can be utilized.

Certificate of Proper Function (SLF) Flow
  1. 1

    Open and register on the simbg.pu.go.id(opens in a new tab) website

  2. 2

    The completeness of the files is checked by the Technical Service verifier

  3. 3

    Technical Consultation Meeting by TPA/TPT

  4. 4

    Letter of compliance with technical standards by the head of the technical service

    If you have a PBG.

  5. 5

    Retribution calculation

    If you don't have a PBG.

  6. 6

    Issuance of SLF

    If you have a PBG: Issuance of SLF. If you don't have a PBG: Delivery of SKRD, Payment of Retribution and Issuance of SLF and PBG.

General Document Requirements for Certificate of Proper Function (SLF)

Land Data

3
  • Land Certificate
  • Land Use Permit
  • Land and Building Tax Payment Proof

General Data

7
  • Identity Card/Residence Permit Information
  • Spatial Information (ITR/KRK/KKPR)
  • Land Use Permit
  • Environmental Documents
  • Planning Service Provider Data
  • SLF (If already owned)
  • PBG (If already owned)

Architecture Data

2
  • As-built Architectural Drawings
  • Architectural Technical Specifications

Structural Data

3
  • Structural Analysis
  • As-built Structural Drawings
  • Structural Technical Specifications

Building Technical Data

3
  • Functionality Feasibility Report
  • As-built Drawings (Architecture-Structure-MEP)
  • Technical Review Data and Work Contract

PBG / SLF Inspection Flow

The assessment process by the inspector is a crucial stage in ensuring that a building complies with the Building Approval (PBG) and Certificate of Feasibility (SLF). After the PBG decree is issued, the inspector is assigned by the supervisor to conduct an inspection. The construction schedule is determined, and the inspection is carried out according to the established schedule. The inspection results are then evaluated to determine whether the building meets the required standards.

If the inspection results indicate compliance, the final documents are uploaded as the last step before issuing the SLF decree. However, if discrepancies are found, the PBG may be frozen. Once all requirements are met, an SLF issuance notification is sent, and the SLF decree is delivered by the Technical Departments before being printed.

This process ensures that every building receiving an SLF has undergone a thorough verification process and complies with the applicable regulations.

PBG / SLF Inspection Flow
  1. 1

    PBG Decree Issued

  2. 2

    Inspector Assigned by Supervisor

  3. 3

    Add Construction Schedule

  4. 4

    Waiting for Inspection Schedule

  5. 5

    Inspection Conducted by Inspector

  6. 6

    Inspection Results

The inspection result decides what comes next:

Compliant
  1. 7

    Upload Final Documents

  2. 8

    SLF Notification Issued

  3. 9

    SLF Decree Delivered by Technical Department

  4. 10

    Print SLF Decree

Rejected
  1. PBG Document On Hold